Concept drawings are only valuable if they can be coordinated. Engineering, regulation and construction sequencing must enter the conversation early.
A single project structure reduces handover gaps between sketch, preliminary design, authorization and execution.
The goal is not more documents. It is fewer contradictions between the drawing, the tender and the site.